Right now, propane is a really high priority; and, I think I have everything covered for finishing up the micro this month. Mainly, I'm waiting on Kenneth to get more insulation shavings; so, I can finish up the roof; and, to finish packing the walls.
I'm trying to stay focused on the roof, the water line, and the out-house. A friend of mine is going to watch for a post hole digger or handle at an auction he's planning to go to Thurs. night.
Once I have those out of the way, my attention needs to turn to trying to put together an 8'x8' over by the pole. I was able to scavenge a small electric water heater that I HOPE doesn't leak. (I had to dump some water out of it to be able to get it onto the car; so, here's hoping that all it needs is a thermostat or an element. As heavy as it was for its size, it MIGHT just need a good cleaning out...)
After I finish the water line to the micro, I'll have a cut-off valve on it; and, I'll be able to start running a line off of it over to a spot near the power pole. At that point, I can try to set up the 8'x8' and get back to getting a bath when I need it. I'm hoping to have the micro's water line finished Sat. or Sun. I'm short one cut-off valve, a 45 degree fitting, and a straight connector; but, I plan to get those on Fri., when it's raining. While at Lowe's, maybe I'll be able to snag some cull OSB, as well.
I'm trying to stay focused on the roof, the water line, and the out-house. A friend of mine is going to watch for a post hole digger or handle at an auction he's planning to go to Thurs. night.
Once I have those out of the way, my attention needs to turn to trying to put together an 8'x8' over by the pole. I was able to scavenge a small electric water heater that I HOPE doesn't leak. (I had to dump some water out of it to be able to get it onto the car; so, here's hoping that all it needs is a thermostat or an element. As heavy as it was for its size, it MIGHT just need a good cleaning out...)
After I finish the water line to the micro, I'll have a cut-off valve on it; and, I'll be able to start running a line off of it over to a spot near the power pole. At that point, I can try to set up the 8'x8' and get back to getting a bath when I need it. I'm hoping to have the micro's water line finished Sat. or Sun. I'm short one cut-off valve, a 45 degree fitting, and a straight connector; but, I plan to get those on Fri., when it's raining. While at Lowe's, maybe I'll be able to snag some cull OSB, as well.